Preservation Plan: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
(4 intermediate revisions by 3 users not shown) | |||
Line 3: | Line 3: | ||
The survey is volume 17 of the Andover Historical Survey. | The survey is volume 17 of the Andover Historical Survey. | ||
A second plan is being drawn up in conjunction with | A second plan is being drawn up in conjunction with the staff of Memorial Hall Library, in 2007. | ||
In 2003, the town approved the Dimensional Special Permit/Historic Preservation Bylaw to make it harder to demolish old buildings. It doubles the demolition-delay period from 6 to 12 months. | |||
See | See | ||
*[http:// | *[http://andover.mvlc.org/opac/en-US/skin/default/xml/rdetail.xml?r=91460&t=andover%20historic%20building%20survey&tp=title&d=0&hc=1&rt=title Andover Historic Building Survey], Volume 17. | ||
*"Demolition delay doubled," ''Andover Townsman'', Jaunary 22, 2004. | |||
*"Historians seek to delay demolitions," ''Eagle Tribune'', March 25, 2007. | |||
<br style="clear:both;" /> | <br style="clear:both;" /> | ||
--[[User:Eleanor|Eleanor]] 15:53, June 14, 2007 (EDT) | --[[User:Eleanor|Eleanor]] 15:53, June 14, 2007 (EDT)<br> | ||
--[[User:Kim|Kim]] 19:23, September 5, 2012 (EDT) | |||
back to [[Main Page|Main Page]] | back to [[Main Page|Main Page]] | ||
[[Category:Andover Answers Index]] | [[Category:Andover Answers Index]] |
Latest revision as of 18:23, 5 September 2012
The Historical Commission completed a Preservation Plan for the town of Andover on August 7, 1980. The document affirms the Commissions's "general policy of preserving, protecting, and developing the historical, architectual, and archeological assests of Andover." (page 3)
The survey is volume 17 of the Andover Historical Survey.
A second plan is being drawn up in conjunction with the staff of Memorial Hall Library, in 2007.
In 2003, the town approved the Dimensional Special Permit/Historic Preservation Bylaw to make it harder to demolish old buildings. It doubles the demolition-delay period from 6 to 12 months.
See
- Andover Historic Building Survey, Volume 17.
- "Demolition delay doubled," Andover Townsman, Jaunary 22, 2004.
- "Historians seek to delay demolitions," Eagle Tribune, March 25, 2007.
--Eleanor 15:53, June 14, 2007 (EDT)
--Kim 19:23, September 5, 2012 (EDT)
back to Main Page