Memorial Hall Library - Landscaping: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
Line 1: | Line 1: | ||
<gallery caption="Memorial Hall Library | See | ||
Image: | * Andover File - MHL - Landscaping | ||
Image: | <gallery caption="Memorial Hall Library Planting prior to October 2011" widths="240px" heights="280px" perrow="3"> | ||
Image: | Image:Image:Plantings front of library.jpg|Yellowwood Tree that is designated on this diagram (to the right side of the front door) was cut down in November 2001. | ||
Image:Image:Phyllis Bingham Garden side entrance.jpg| | |||
Image:Image:Phyllis Bingham Garden daylilies.jpg|page 3 | |||
</gallery> | </gallery> | ||
Line 8: | Line 10: | ||
[[Image:Plantings front of library.jpg|thumb||left| Plantings Front of the Library Note: The Yellowwood Tree that is designated on this diagram (to the right side of the front door) was cut down in November 2001.]] | [[Image:Plantings front of library.jpg|thumb||left| Plantings Front of the Library Note: The Yellowwood Tree that is designated on this diagram (to the right side of the front door) was cut down in November 2001.]] | ||
<br> | <br> |
Revision as of 13:37, 12 October 2011
See
- Andover File - MHL - Landscaping
- Image:Plantings front of library.jpg
Yellowwood Tree that is designated on this diagram (to the right side of the front door) was cut down in November 2001.
- Image:Phyllis Bingham Garden side entrance.jpg
- Image:Phyllis Bingham Garden daylilies.jpg
page 3
The Main Street entrance to the building was re-landscaped in October 2011.