Preservation Plan

From Andover Answers
Revision as of 18:23, 5 September 2012 by Kim (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The Historical Commission completed a Preservation Plan for the town of Andover on August 7, 1980. The document affirms the Commissions's "general policy of preserving, protecting, and developing the historical, architectual, and archeological assests of Andover." (page 3)

The survey is volume 17 of the Andover Historical Survey.

A second plan is being drawn up in conjunction with the staff of Memorial Hall Library, in 2007.

In 2003, the town approved the Dimensional Special Permit/Historic Preservation Bylaw to make it harder to demolish old buildings. It doubles the demolition-delay period from 6 to 12 months.

See

  • "Demolition delay doubled," Andover Townsman, Jaunary 22, 2004.
  • "Historians seek to delay demolitions," Eagle Tribune, March 25, 2007.


--Eleanor 15:53, June 14, 2007 (EDT)
--Kim 19:23, September 5, 2012 (EDT) back to Main Page